Multi-unit renovation: bulk loft insulation procurement for investors

Ahmet Alptekin Kasar

Founder, Managing Director

7 min

Updated: 2026-11-19

This page is for investors, property and asset managers, renovation groups, the contractors they hire, and wholesalers: anyone insulating the loft floors of several buildings or many flats in one procurement.

Why buy it as one package?

When every building starts separately, with different materials, the build-up, the documents and the deliveries have to be agreed again on every site. A portfolio is better served by one procurement:

  • One specification: the same build-up on every building, so the tender, the acceptance and the checks are the same too.
  • One document set: the same products, the same declarations of performance (DoP) and CE markings.
  • Staged deliveries: material arrives when a building's turn comes, not for the whole portfolio at once.

In the EKR attic programme we supplied loft-floor material to contractors, with the papers for every delivery; contractor partners did the installation. We apply the same routine to bulk deliveries across several buildings. The EKR programme is currently paused.

Schematic: delivery tiers for loft insulation. Three columns: single building, several buildings in one city, portfolio across the country. The package per building is the same at every tier: glass wool 2 × 12.5 cm, second layer cross-laid; BK45 vapour control Sd 20 m on every ceiling; BD70 breathable membrane Sd 0.02 m where needed. Delivery: pallet lot, full truck, staged trucks. Transit TR → HU 3–5 days (about 5 on average). Documents: DoP, CE, data sheet with every delivery. Price: after survey, per project.
Schematic. Source: ODE and EuConX declarations of performance and data sheets; EuConX delivery dataDownload PNG
Single buildingSeveral buildings, one cityPortfolio across the country
Package per buildingglass wool 2 × 12.5 cm, second layer cross-laid; BK45 vapour control, Sd 20 m, every ceiling; BD70 breathable, Sd 0.02 m, where neededsamesame
Deliverypallet lotfull truckstaged trucks
Transit TR → HU3–5 days (about 5 on average)3–5 days (about 5 on average)3–5 days (about 5 on average)
DocumentsDoP, CE, data sheet with every deliveryDoP, CE, data sheet with every deliveryDoP, CE, data sheet with every delivery
Priceafter survey, per projectafter survey, per projectafter survey, per project

Source: ODE and EuConX declarations of performance and data sheets; EuConX delivery data.

The package per building

Every building gets the same build-up, from the bottom up.

On every ceiling a vapour control layer goes down first, on the heated side. EuConX BK45 has an Sd value of 20 m.

The glass wool follows in two layers: 2 × 12.5 cm, the second layer laid crosswise so it covers the joints of the first. ODE Starflex has a declared thermal conductivity of λD 0.039 W/(m·K).

Where the insulation needs a breathable cover, EuConX BD70 goes on top, with an Sd value of 0.02 m.

Walkways can be added on request as a separate item. The build-up in detail is in our loft insulation supply pack guide; we do not repeat it here.

A large attic under timber roof trusses: the floor is covered with pale yellow glass wool in two stacked layers, the edge of the bottom layer and a clear film on the slab visible in front; a roof window on the left and a brick chimney at the back
AI-generated illustrative image

Planning quantities across many buildings

Take quantities building by building rather than estimating them for the whole portfolio:

1. Survey the loft floor area to be insulated in each building.

2. Apply the same build-up to it: BK45, two layers of glass wool, BD70 where needed.

3. Add up the per-building lines and split them into delivery stages.

That keeps the bill of materials checkable per building, and a change only affects that building. Clearing, repairs and difficult access are priced separately, after the survey.

Delivery: from a pallet lot to staged trucks

A single building usually needs a pallet lot; several buildings in one city, a full truck; a portfolio across the country, staged trucks in building order. Transit from Turkey is 3–5 days, about 5 on average. Delivery covers all of Hungary. EuConX supplies the material, and a contractor partner installs it.

Pallets of pale yellow glass wool rolls in clear stretch film in a long row on a snowy pavement; the open side of a truck trailer on the right, and a long multi-storey apartment block with balconies and bare trees behind
AI-generated illustrative image

Planning the 2027 schedule is covered in our article on staging TR → HU supply for the 2027 grant waves.

Documents with every delivery

Every delivery comes with the DoP, CE marking and data sheet for the ordered type. In a portfolio, file them per building together with the order and the delivery note.

First page of the declaration of performance for ODE Starflex / Lunaflex / Evomineral glass wool (No 101, EU 305/2011): 1. product type ODE STARFLEX / LUNAFLEX / EVOMINERAL blanket and board; 2. intended use: thermal insulation products for buildings, factory-made mineral wool (MW) products; 3. manufacturer ODE Yalıtım Sanayi ve Ticaret A.Ş., Istanbul; 4. authorised representative: Not Applicable; 5. AVCP: System 1, System 3; 6a. harmonised standard EN 13162:2012+A1:2015, notified bodies NB 1020 and NB 2164
Real document: first page of the ODE glass wool declaration of performance. Source: ode.com.tr/_upload/pdf/GLASSWOOL_BLANKET-BOARD_DECLARATION_OF_PERFORMANCE_-_EN_13162.pdf

Own-brand versions of the membranes are covered in our private-label roof membrane article.

Wekerle Panel and Condominium Programmes

According to Government Resolution 1359/2026 (XI. 3.), the two programmes target at least 60,000 panel and condominium flats by 2030, with maximum support per flat of HUF 4 million (panel) and HUF 5 million (traditional condominium), and a non-repayable share of 30–50%. According to wekerle.kormany.hu the supported works include thermal insulation, the programme starts in March 2027, and buildings rated A–C are not covered. Whether a building or a work item is eligible is decided by the call.

The full material list for a panel block is in our panel-block energy retrofit material list. Material supply for the renovation grant is covered in our 2027 renovation grant supply article (in Hungarian), procurement risks in our EKR procurement risk article, and the programme itself on the EKR programme page.

Request a quote

Send the loft floor area, the address and the preferred schedule for each building: partner quote request · +36 30 485 0258 · info@euconx.com. We reply on the same working day; the final price is set per project after a survey.

Frequently asked questions

Why buy loft insulation for several buildings in one procurement?

One specification, one document set and one delivery schedule cover the whole portfolio. The material arrives building by building, in stages.

What goes on the loft floor of each building?

A BK45 vapour control layer (Sd 20 m) on every ceiling, glass wool 2 × 12.5 cm on top with the second layer cross-laid, and a BD70 breathable membrane (Sd 0.02 m) where needed. Walkways on request, as a separate item.

How are quantities planned across many buildings?

Building by building: survey the loft floor area, apply the same build-up, then add the lines up and split them into delivery stages.

How long does delivery from Turkey take?

Transit is 3–5 days, about 5 on average. Delivery covers all of Hungary.

Which documents come with a delivery?

The DoP, CE marking and data sheet for the ordered type, with every delivery.

What does loft insulation for a portfolio cost?

The final price is set per project after a survey. Clearing, repairs and difficult access are separate items.

Sources

1. National Legislation Database: Government Resolution 1359/2026 (XI. 3.) on launching the Wekerle Panel Programme and the Wekerle Condominium Programme (points 1 a)–c), in Hungarian)

2. wekerle.kormany.hu (Wekerle+ Condominium and Panel Programme: supported works, start date, A–C rating; in Hungarian)

3. ODE and EuConX declarations of performance and data sheets (λD, Sd, thickness)

4. EuConX: delivery and company data (transit, reply time)

bulk loft insulation multi-unitcondominium loft floor insulation Hungaryglass wool bulk supplyinvestors

Planning a project? Let’s talk.

Send the material schedule or project requirements. We’ll help match the product and prepare a clear quotation.