Skip to main content
EUCONXSupply Chain

4PL BUILDING-MATERIAL SOURCING

One partner.For the wholesupply chain.

From Turkish manufacturers to Hungarian construction sites. EuConX coordinates sourcing, quality checks, documentation, customs and transport.

One point of contact. Coordinated processes.

Containerised building-material cargo on the Turkey–Hungary supply route.Two professionals discussing a plan at a construction site.Pallet of glass-wool rolls prepared for quality inspection.Two business partners shaking hands at a construction site.

01Factory cargo timed to the Hungarian site.

Illustrative — not a photograph of a EuConX project.

01Assessment
02Sourcing
03Quality and documentation
04Customs and delivery

THE EUCONX ROLE

More than transport. Coordination from end to end.

With 4PL, manufacturers, quality checks, customs and transport are not separate tasks for you to manage. EuConX brings them together in one process aligned with your project.

Let’s discuss your project →

Our Services

Six steps, one chain

From the factory source to the construction site, one point of contact carries the chain, so you do not have to hold the threads together.

  • Strategic Sourcing

    Strategic Sourcing

    You buy from the maker, not from the end of the chain

    The fewer hands the goods pass through, the fewer margins are added on top. We work directly with Turkish manufacturers, and you receive a comparable quotation built on the factory source.

    Details
  • Logistics Orchestration

    Logistics Orchestration

    One route, one schedule, one person responsible

    The road route from Istanbul to Budapest takes 3–5 days, typically about 5, with the customs papers travelling with the load. We time the delivery to the site, so the lorry arrives when the crew does.

    Details
  • Compliance & Customs

    Compliance & Customs

    The papers are ready before the lorry leaves

    CE marking, the declaration of performance and the certificate of origin travel with the shipment, so customs clearance takes 2–3 hours, not days.

    Details
  • Quality Assurance

    Quality Assurance

    We check at the factory, not on the building site

    Before shipping we carry out factory quality checks and choose certified producers. The ISO, EUCEB and EPD certificates for ODE Starflex belong to the producer, and the product documentation arrives with the shipment.

    Details
  • Delivery Planning

    Delivery Planning

    Scheduling starts at the order, not at the delay

    From order to site, the typical lead time is 1–2 weeks. We give you a confirmed delivery window, and we reply to your questions on the same working day.

    Details
  • Partner Network

    Partner Network

    A contractor partner stands behind the manufacturers

    Alongside the Turkish manufacturers in the catalogue, our contractor partner carries out the installation. EuConX does not install: it supplies material and papers, so everyone does their own trade.

    Details

In motion

From sketch to reality

Four short films on how an attic sketch becomes an insulated space: the material, the membrane and the shipment arriving by sea, rail and road.

Planning

From sketch to finished attic

Send us a floor plan or a sketch and we turn it into a material list and a delivery plan. Your contractor partner does the installation.

Reply the same working day

The films are AI-generated illustrations. Product data comes from manufacturer documentation.

Materials Catalog

Featured products

Products from selected manufacturers, with the CE documentation that arrives with the shipment.

Full product catalogue
An unrolled yellow glass wool roll between the ceiling joists of a sunlit Budapest attic
1 item

Glasswool

ODE Starflex glass wool for attics and framed walls, λD 0.039 W/m·K, with an EPD. 1.1 million m² delivered in 2025–26.

Joining as a manufacturer or distributor?

Let’s discuss your product range, target market and terms of cooperation.

Discuss a partnership

The EuConX Difference

Why choose us?

Traditional procurement vs. EuConX orchestration — the difference is clear.

  • Cost

    TraditionalEvery intermediary adds a margin to the price
    EuConXDirect factory sourcing, no intermediate mark-up layers
  • Lead time

    TraditionalWeeks of back-and-forth, uncertain date
    EuConXTypically 1–2 weeks, with a confirmed delivery window
  • Risk

    TraditionalQuality only shows up on site
    EuConXFactory checks and certified producers, before shipping
  • Compliance

    TraditionalOwn paperwork, room for error
    EuConXPapers and customs in one hand; clearance takes 2–3 hours
  • Transparency

    TraditionalBlack box: no visibility
    EuConXOne contact who answers for the status

Ready to get started?

Estimate your costs with our calculator, or talk to us about your project. We reply on the same working day.