Wekerle panel and condominium programmes: contractor prequalification

Ahmet Alptekin Kasar

Founder, Managing Director

7 min

Updated: 2026-11-17

This page is for contractors, construction documentation preparers and designers, renovation groups, investors, energy consultants and wholesalers working in Hungary. Searches for "Wekerle előminősítés" mostly return pages about loan prequalification. This page is about contractor prequalification: what points 1 f) and 4 of the resolution say.

What the resolution says about contractors

According to the resolution, one of the programmes' principles is prequalification for the preparers of construction documentation and for contractors (point 1 f). Point 4 calls on the Minister of Transport and Investment, involving the Minister for Economy and Energy, to work out this prequalification system. The resolution names the aim: architectural and townscape fit and adequate quality guarantees. The deadline is 15 December 2026.

The programme framework, according to the resolution: at least 60,000 panel and condominium flats reached by 2030. Maximum support per flat is HUF 4 million for panel buildings and HUF 5 million for conventionally built condominiums. The non-repayable share is at least 30% and at most 50%. Funding comes from KEHOP Plusz and ETS allowance revenue. The programmes are administered by the Hungarian Development Bank (MFB) and the financial institutions contracted with it.

Under point 2, the call for applications must be worked out by 15 December 2026 and the application procedure by 28 February 2027. Here, too, the resolution names quality construction work, townscape fit and avoiding unnecessary administrative burden.

Three-column overview of Government Resolution 1359/2026 (XI. 3.). What the resolution states: prequalification for documentation preparers and contractors; prequalification system 15 Dec 2026; call for applications 15 Dec 2026; application procedure 28 Feb 2027; administered by MFB; 60,000 flats by 2030; maximum support per flat HUF 4 M panel, HUF 5 M condominium; non-repayable share 30–50%. Still open: prequalification criteria, text of the call, application procedure. What a contractor can prepare now: supplier DoP, CE marking, λD, Sd values, delivery window and lead time
Source: Government Resolution 1359/2026 (XI. 3.), https://njt.jog.gov.hu/jogszabaly/2026-1359-30-22; wekerle.kormany.hu, https://wekerle.kormany.huDownload PNG
ColumnItemValue
What the resolution statesPrequalificationconstruction documentation preparers and contractors
What the resolution statesPrequalification system deadline15 Dec 2026
What the resolution statesCall for applications15 Dec 2026
What the resolution statesApplication procedure28 Feb 2027
What the resolution statesAdministered byMFB and contracted financial institutions
What the resolution statesTargetat least 60,000 flats by 2030
What the resolution statesMaximum support per flatpanel HUF 4 M, conventional condominium HUF 5 M
What the resolution statesNon-repayable share30–50%
Still openPrequalification criterianot published (17 Nov 2026)
Still openText of the callnot published (17 Nov 2026)
Still openApplication procedurenot published (17 Nov 2026)
What a contractor can prepare nowMaterial documentationsupplier DoP, CE marking, λD, Sd values
What a contractor can prepare nowDeliverydelivery window, lead time

Source: Government Resolution 1359/2026 (XI. 3.) (in Hungarian); wekerle.kormany.hu (in Hungarian).

What is still open

The prequalification criteria have not been published yet (17 Nov 2026). It is not known which references, staffing, certificates or documents will be required, or how a firm gets into the system. The text of the call and the application procedure are open too. Nobody can give a reliable answer on this today, including us.

According to wekerle.kormany.hu, the works supported by the Condominium and Panel Programme include thermal insulation, window replacement, lighting and shading. The site gives the start as March 2027 and states that the programme does not cover buildings rated A–C.

We will update this page as soon as the criteria are published.

Seven-storey panel block in winter: scaffolding on the left wing with yellow insulation boards and white strips on the façade, the right wing still bare grey panels with balconies; bare trees, shrubs and snowy grass in front
AI-generated illustrative image

What you can prepare now on the material side

Whatever the prequalification ends up requiring, a contractor or documentation preparer can put the material side in order now. The resolution names quality guarantees as an aim; the material paperwork is needed at every handover anyway.

  • Supplier declaration of performance (DoP) for every material, for the ordered type and thickness.
  • CE marking on the product or packaging, matching the DoP.
  • Declared thermal conductivity (λD) for the insulation, as per the DoP.
  • Sd values for the membranes: vapour barrier below, vapour-open membrane above.
  • Product data sheets for the documentation.
  • Delivery window and lead time for the schedule.
  • Order and delivery note set up so every item can be traced.

We do not repeat the detailed acceptance list here: our Wekerle+ material checklist covers what to fix in the order and what to check on delivery. Reading a DoP and CE marking is covered in our article on DoP and CE documents.

First page of the ODE Starflex / Lunaflex / Evomineral glass wool declaration of performance (No 101, EU 305/2011): 1. product type ODE STARFLEX / LUNAFLEX / EVOMINERAL blanket and board; 2. intended use: thermal insulation products for buildings, factory made mineral wool (MW) products; 3. manufacturer ODE Yalıtım Sanayi ve Ticaret A.Ş., Istanbul; 4. authorised representative: Not Applicable; 5. AVCP: System 1, System 3; 6a. harmonised standard EN 13162:2012+A1:2015, notified bodies NB 1020 and NB 2164
Real document: first page of the ODE glass wool declaration of performance. Source: ode.com.tr/_upload/pdf/GLASSWOOL_BLANKET-BOARD_DECLARATION_OF_PERFORMANCE_-_EN_13162.pdf

What we bring from the EKR attic programme

In the EKR attic programme we supplied materials to contractors, with the paperwork for every shipment; contractor partners did the installation. EKR is currently paused. Procurement risks are covered in our article on EKR procurement risk and on the EKR programme page.

Attic slab on a concrete base: pale yellow glass wool boards laid in two layers on a grey membrane, part of the top layer covered with a white mesh-reinforced membrane; timber rafters and a roof window in the background
AI-generated illustrative image

On an attic slab, glass wool goes down in two cross-laid layers. ODE Starflex has a declared thermal conductivity of λD 0.039 W/(m·K); the typical build-up is 2 × 12.5 cm.

For membranes, the Sd value is what matters. The EuConX BK45 vapour barrier has an Sd of 20 m and goes under the insulation, on the heated side. In our attic package, every ceiling gets a vapour barrier.

A vapour-open membrane goes over the insulation. EuConX BD70 has an Sd of 0.02 m, so moisture can leave the insulation.

Delivery and traceability

EuConX supplies materials; it does not install. A contractor partner does the installation. Transit from Turkey takes 3–5 days, about 5 on average, with delivery anywhere in Hungary. The final price is set after a survey.

StepWhat happensTime
Enquiryyou send the m², build-up, delivery point and schedule–
Replywe respond to the enquirysame working day
Transit Turkey → Hungaryfrom the manufacturer to the site3–5 days, about 5 on average
Deliveryanywhere in Hungary, with DoP and delivery noteas scheduled

Source: EuConX company data.

Material supply for Hungary's 2027 home renovation grant, including its prequalification questions, is covered in our article on renovation grant material supply (in Hungarian).

Request a quote

Send the project m², build-up, delivery point and schedule: partner enquiry · +36 30 485 0258 · info@euconx.com. We reply the same working day.

Frequently asked questions

Who does prequalification in the Wekerle panel and condominium programmes apply to?

According to point 1 f) of the resolution, to construction documentation preparers and contractors.

When must the prequalification system be ready?

According to point 4 of the resolution, by 15 December 2026. The call for applications is also due by 15 December 2026, the application procedure by 28 February 2027.

Have the prequalification criteria been published?

No, not as of 17 Nov 2026. We will update this page when they are.

Which works does the programme support?

According to wekerle.kormany.hu: thermal insulation, window replacement, lighting and shading. The start is March 2027; buildings rated A–C are not covered.

What can a contractor prepare now?

The material documentation: supplier DoP, CE marking, λD, Sd values, product data sheets, delivery window, order and delivery note.

Does EuConX install the materials?

No. We supply materials from Turkey with 3–5 days in transit and deliver anywhere in Hungary. A contractor partner installs; the final price is set after a survey.

Sources

1. Nemzeti Jogszabálytár: Government Resolution 1359/2026 (XI. 3.) on launching the Wekerle Panel Programme and the Wekerle Condominium Programme (in Hungarian; points 1 a)–f), 2 and 4)

2. wekerle.kormany.hu (in Hungarian; Wekerle+ Condominium and Panel Programme: supported works, start, A–C rating)

3. ODE and EuConX declarations of performance (λD, Sd)

4. EuConX: delivery and company data (transit, response time)

Wekerle contractor prequalificationWekerle condominium programmeGovernment Resolution 1359/2026contractor prequalification Hungarycontractors

Planning a project? Let’s talk.

Send the material schedule or project requirements. We’ll help match the product and prepare a clear quotation.