This page is for contractors, construction documentation preparers and designers, renovation groups, investors, energy consultants and wholesalers working in Hungary. Searches for "Wekerle előminősítés" mostly return pages about loan prequalification. This page is about contractor prequalification: what points 1 f) and 4 of the resolution say.
What the resolution says about contractors
According to the resolution, one of the programmes' principles is prequalification for the preparers of construction documentation and for contractors (point 1 f). Point 4 calls on the Minister of Transport and Investment, involving the Minister for Economy and Energy, to work out this prequalification system. The resolution names the aim: architectural and townscape fit and adequate quality guarantees. The deadline is 15 December 2026.
The programme framework, according to the resolution: at least 60,000 panel and condominium flats reached by 2030. Maximum support per flat is HUF 4 million for panel buildings and HUF 5 million for conventionally built condominiums. The non-repayable share is at least 30% and at most 50%. Funding comes from KEHOP Plusz and ETS allowance revenue. The programmes are administered by the Hungarian Development Bank (MFB) and the financial institutions contracted with it.
Under point 2, the call for applications must be worked out by 15 December 2026 and the application procedure by 28 February 2027. Here, too, the resolution names quality construction work, townscape fit and avoiding unnecessary administrative burden.
| Column | Item | Value |
|---|---|---|
| What the resolution states | Prequalification | construction documentation preparers and contractors |
| What the resolution states | Prequalification system deadline | 15 Dec 2026 |
| What the resolution states | Call for applications | 15 Dec 2026 |
| What the resolution states | Application procedure | 28 Feb 2027 |
| What the resolution states | Administered by | MFB and contracted financial institutions |
| What the resolution states | Target | at least 60,000 flats by 2030 |
| What the resolution states | Maximum support per flat | panel HUF 4 M, conventional condominium HUF 5 M |
| What the resolution states | Non-repayable share | 30–50% |
| Still open | Prequalification criteria | not published (17 Nov 2026) |
| Still open | Text of the call | not published (17 Nov 2026) |
| Still open | Application procedure | not published (17 Nov 2026) |
| What a contractor can prepare now | Material documentation | supplier DoP, CE marking, λD, Sd values |
| What a contractor can prepare now | Delivery | delivery window, lead time |
Source: Government Resolution 1359/2026 (XI. 3.) (in Hungarian); wekerle.kormany.hu (in Hungarian).
What is still open
The prequalification criteria have not been published yet (17 Nov 2026). It is not known which references, staffing, certificates or documents will be required, or how a firm gets into the system. The text of the call and the application procedure are open too. Nobody can give a reliable answer on this today, including us.
According to wekerle.kormany.hu, the works supported by the Condominium and Panel Programme include thermal insulation, window replacement, lighting and shading. The site gives the start as March 2027 and states that the programme does not cover buildings rated A–C.
We will update this page as soon as the criteria are published.

What you can prepare now on the material side
Whatever the prequalification ends up requiring, a contractor or documentation preparer can put the material side in order now. The resolution names quality guarantees as an aim; the material paperwork is needed at every handover anyway.
- Supplier declaration of performance (DoP) for every material, for the ordered type and thickness.
- CE marking on the product or packaging, matching the DoP.
- Declared thermal conductivity (λD) for the insulation, as per the DoP.
- Sd values for the membranes: vapour barrier below, vapour-open membrane above.
- Product data sheets for the documentation.
- Delivery window and lead time for the schedule.
- Order and delivery note set up so every item can be traced.
We do not repeat the detailed acceptance list here: our Wekerle+ material checklist covers what to fix in the order and what to check on delivery. Reading a DoP and CE marking is covered in our article on DoP and CE documents.

What we bring from the EKR attic programme
In the EKR attic programme we supplied materials to contractors, with the paperwork for every shipment; contractor partners did the installation. EKR is currently paused. Procurement risks are covered in our article on EKR procurement risk and on the EKR programme page.

On an attic slab, glass wool goes down in two cross-laid layers. ODE Starflex has a declared thermal conductivity of λD 0.039 W/(m·K); the typical build-up is 2 × 12.5 cm.
For membranes, the Sd value is what matters. The EuConX BK45 vapour barrier has an Sd of 20 m and goes under the insulation, on the heated side. In our attic package, every ceiling gets a vapour barrier.
A vapour-open membrane goes over the insulation. EuConX BD70 has an Sd of 0.02 m, so moisture can leave the insulation.
Delivery and traceability
EuConX supplies materials; it does not install. A contractor partner does the installation. Transit from Turkey takes 3–5 days, about 5 on average, with delivery anywhere in Hungary. The final price is set after a survey.
| Step | What happens | Time |
|---|---|---|
| Enquiry | you send the m², build-up, delivery point and schedule | – |
| Reply | we respond to the enquiry | same working day |
| Transit Turkey → Hungary | from the manufacturer to the site | 3–5 days, about 5 on average |
| Delivery | anywhere in Hungary, with DoP and delivery note | as scheduled |
Source: EuConX company data.
Material supply for Hungary's 2027 home renovation grant, including its prequalification questions, is covered in our article on renovation grant material supply (in Hungarian).
Request a quote
Send the project m², build-up, delivery point and schedule: partner enquiry · +36 30 485 0258 · info@euconx.com. We reply the same working day.
Frequently asked questions
Who does prequalification in the Wekerle panel and condominium programmes apply to?
According to point 1 f) of the resolution, to construction documentation preparers and contractors.
When must the prequalification system be ready?
According to point 4 of the resolution, by 15 December 2026. The call for applications is also due by 15 December 2026, the application procedure by 28 February 2027.
Have the prequalification criteria been published?
No, not as of 17 Nov 2026. We will update this page when they are.
Which works does the programme support?
According to wekerle.kormany.hu: thermal insulation, window replacement, lighting and shading. The start is March 2027; buildings rated A–C are not covered.
What can a contractor prepare now?
The material documentation: supplier DoP, CE marking, λD, Sd values, product data sheets, delivery window, order and delivery note.
Does EuConX install the materials?
No. We supply materials from Turkey with 3–5 days in transit and deliver anywhere in Hungary. A contractor partner installs; the final price is set after a survey.
Sources
1. Nemzeti Jogszabálytár: Government Resolution 1359/2026 (XI. 3.) on launching the Wekerle Panel Programme and the Wekerle Condominium Programme (in Hungarian; points 1 a)–f), 2 and 4)
2. wekerle.kormany.hu (in Hungarian; Wekerle+ Condominium and Panel Programme: supported works, start, A–C rating)
3. ODE and EuConX declarations of performance (λD, Sd)
4. EuConX: delivery and company data (transit, response time)
Planning a project? Let’s talk.