In Hungary's Energy Efficiency Obligation Scheme (EKR, Energiahatékonysági Kötelezettségi Rendszer), obligated parties meet their duty through energy-saving measures, and the savings are verified (HEM, hitelesített energiamegtakarítás). EKR is an obligation scheme: it is not a grant and not public procurement. Whether a given measure counts is decided by the obligated party, the energy auditor and the verifying body, never by the material supplier. What a supplier can do is make sure the documents behind the material are complete before the job starts.
Document checklist for the insulation material
1. CE marking and a Hungarian declaration of performance (DoP). Ask for the DoP in Hungarian. It should show thermal conductivity (λ), reaction to fire and dimensional tolerances for the exact product delivered.
2. EUCEB certification for mineral wool. This is the producer's certificate for the fibre. For ODE Starflex glass wool, it belongs to the producer, ODE.
3. EPD (environmental product declaration). For ODE Starflex glass wool the number is EPD-IES-0030984:001. An EPD reports environmental information; it is not a performance certificate.
4. Traceable delivery notes. Invoices and delivery documents should match the quantities and product names that were installed.
Ask your obligated party whether they require anything beyond this list. Their requirements take precedence over any general checklist.
The attic pack we have supplied
For the nationwide free attic campaigns, the material supplied through EuConX was:
- Insulation: 2 × 12.5 cm (25 cm in total) ODE Starflex glass wool, λD 0.039 W/(m·K), with CE, EUCEB and EPD EPD-IES-0030984:001.
- Vapour control: BK45 vapour barrier on the warm, interior side.
- Protection: BD70 vapour-open membrane on the cold, exterior side.
BK45 and BD70 are EuConX's own brand. This describes the material we supplied; it is not an EKR approval. The scheme rules for contractors are in our EKR rules guide, and the supply-side risks are covered in EKR procurement risk before 2027. For the CE side of the checklist, read the CE marking guide.
Ask for the file before you order
For a material pack with documents, send the product, thickness and quantity. We reply the same working day. See the EKR programme page or contact EuConX, write to info@euconx.com or call +36 30 485 0258. EuConX does not install; the contractor partner does.
Planning a project? Let’s talk.
Send the material schedule or project requirements. We’ll help match the product and prepare a clear quotation.