Ahmet Alptekin Kasar
Founder, Managing Director
Updated: 2026-11-20
This piece is for buyers at prefab house manufacturers, timber-frame plants and large contractors who order insulation against an annual framework with regular call-offs.
What DAP means, and what it does not
DAP (Delivered at Place) is one of the Incoterms 2020 rules. The seller delivers the goods to the named place and puts them at the buyer's disposal on the arriving vehicle, ready for unloading. That is where risk passes. Unloading is the buyer's job, and under DAP import clearance is also the buyer's, where it applies.
So give the exact address in the enquiry, not just the town: the plant gate where the truck will unload. EuConX DAP prices cover freight, packaging and delivery costs to the address given. Who handles what on a given route is set out item by item in the offer.
One truck: this many square metres
Insulation fills a truck by volume, not by weight. That is why square metres vary so much by thickness:
| Product | Thickness | m² per truck (13.6 m) |
|---|---|---|
| ODE Starflex Glass Wool Roll 040 | 60 mm | 8,448 |
| ODE Starflex Glass Wool Roll 040 | 100 mm | 7,920 |
| ODE Evomineral Glass Wool Partition Board 037 | 40 mm | 7,603 |
| ODE Starflex Glass Wool Roll 035 | 100 mm | 4,118 |
| ODE Starflex Glass Wool Roll 035 | 140 mm | 2,978 |
| Bonus Premium F 120 Stone Wool Board | 50 mm | 2,534 |
| Bonus Premium F 120 Stone Wool Board | 100 mm | 824 |
Source: EuConX technical datasheets.
Worked example: 50,000 m² a year of 140 mm roll is 50,000 ÷ 2,978 = 16.8, so 17 trucks. The same area of 100 mm stone wool board would be 61 trucks. Freight is priced per truck, so how well each truck is filled shows up directly in the price per square metre.
Call-offs, planned in trucks
The production line consumes weekly; a truck arrives all at once. In practice, monthly or weekly consumption is broken down into trucks, and call-offs are timed so the warehouse can hold one truckload of buffer. Mixed loads of several thicknesses or products can be arranged; the truck then fills in proportion to the products' volume.
In our current offers we quote lead times of 2–3 weeks for glass wool and 3–4 weeks for stone wool and boards from order. We confirm the exact date when you order.
Unloading at the plant
Insulation usually arrives on a curtain-sided semi-trailer that can be unloaded from the side by forklift. The plant needs a forklift and covered or protected storage. Rolls and boards arrive in packs or on pallets; the datasheet gives the square metres per pack for each thickness. Prepare storage before an unloading planned on a rainy day: the packaging is made for transport, not for long outdoor storage.
To decide what goes on the truck, see our glass wool and stone wool comparison and the article on choosing roll thickness. The products are on the EuConX mineral wool page.
Frequently asked questions
What does the EuConX DAP price include?
Freight, packaging and delivery costs to the address given. Unloading is the buyer's task; who handles what on a route is set out item by item in the offer.
How many square metres of insulation fit on one truck?
It depends on thickness and product: at 100 mm a full 13.6 m truck carries 4,118 m² of λ 0.035 glass wool roll, 7,920 m² of the 040 roll, or 824 m² of stone wool board.
Can one truck carry several products?
Yes, mixed loads can be arranged. The truck then fills in proportion to the products' volume.
What is the lead time?
In our current offers, 2–3 weeks for glass wool and 3–4 weeks for stone wool and boards from order. We confirm the exact date when you order.
What does the plant need for unloading?
A forklift and covered or protected storage. The goods arrive on a curtain-sided truck that unloads from the side.
Sources
1. EuConX technical datasheets (m² per pack, m² per truck): https://euconx.com/en/products/datasheets
2. ICC, Incoterms 2020: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/
Planning a project? Let’s talk.
Send the material schedule or project requirements. We’ll help match the product and prepare a clear quotation.
